Schedule a meeting

Hospital

Location

Zurich, Switzerland

Floors

8 floors

Total Built-Up Area

20,000 m²


Building Type

Hospital

BIM Services Provided
3D BIM Modeling
Delivered a comprehensive digital twin of the hospital, incorporating architectural details, medical equipment layouts, and critical systems like HVAC and plumbing.
Clash Detection
Identified and resolved over 500 potential clashes, ensuring smooth integration of electrical, mechanical, and plumbing systems in complex areas like operating rooms and ICUs.
Energy Efficiency Optimization
Designed an energy-efficient building with solar panels, optimized ventilation, and smart lighting systems, reducing energy consumption by 30%.
Construction Sequencing (4D BIM)
Developed phased construction plans for uninterrupted project execution while coordinating with medical equipment suppliers for seamless installation.
Cost Management (5D BIM)
Integrated detailed cost tracking, resulting in a project budget of €150 million, maintained within 1.5% of the initial estimate.