Data Center
Location
South Europe
Floors
3 floors
Total Built-Up Area
10,500 m², including 8,000 m² of server rooms and 2,500 m² of support and operational spaces
Building Type
Tier IV data center, ensuring 99.995% uptime and meeting the highest standards of redundancy and reliability
Key Specifications
Total Built-Up Area
10,500 m², including 8,000 m² of server rooms and 2,500 m² of support and operational spaces
BIM Services Provided
3D BIM Modeling
Delivered an accurate digital twin, integrating architectural design, MEP systems, and structural elements for seamless project execution.
Clash Detection
Resolved over 300 potential conflicts between critical systems, including electrical cabling, cooling ducts, and structural supports, saving approximately 20% in rework costs.
Energy Optimization
Designed a geothermal-powered cooling system, reducing operational energy consumption by 40%.
Incorporated LED lighting and smart power distribution for further energy efficiency.
Construction Sequencing (4D BIM)
Developed phased construction plans to complete the project 15% faster than the initial schedule, ensuring an operational launch within 18 months.
Cost Management (5D BIM)
Integrated a detailed cost breakdown, resulting in a budget adherence of 98.7% accuracy, with a total project cost of $75 million.
Facility Management (6D BIM)
Provided a lifecycle management model, enabling predictive maintenance for HVAC systems, servers, and backup generators, improving long-term operational efficiency.