LPG Infrastructure
Location
Ukraine, Kazakhstan, over 10 projects
Building Type
LPG Infrastructure
Key Features:
Facility Type:
LPG pumps, LPG farms
Piping:
Specialized Pipes for Cryogenic Temperature
Operational Buildings:
LPG pump station, LPG storage (farms), Railway and tracks loading/unloading terminal, Firewater pump station, Air compressor unit
Engineering Services Provided:
Feasibility Study (FS):
• Technology Selection: Analysis of available regasification technologies and propane-butane-air mixing (synthetic natural gas).
• Equipment Selection: Identification and assessment of suitable equipment.
• Equipment Selection: Identification and assessment of suitable equipment.
Pre-Project Studies:
• Local Conditions Analysis: Study of geological, climatic, and environmental factors in the construction area.
• Regulatory Compliance: Evaluation of adherence to legislative requirements and obtaining permits.
• Logistics Route Planning: Development of transportation routes for LPG from the facility.
• Regulatory Compliance: Evaluation of adherence to legislative requirements and obtaining permits.
• Logistics Route Planning: Development of transportation routes for LPG from the facility.
Liquefaction Technology Selection:
• Evaluation of Liquefaction Technologies: Selection of the most efficient liquefaction method based on production volumes, ambient temperatures, etc.
• Technical Specifications Development: Creation of detailed equipment and process requirements.
• Technical Specifications Development: Creation of detailed equipment and process requirements.
Design of Core Infrastructure Facilities:
• LPG Production Units Design: Development of plans for equipment layout for liquefaction, storage, and loading.
• Storage Tank Selection: Determination of the type and capacity of LPG storage tanks.
• Transport Infrastructure Development: Design of loading/unloading racks, vaporizers, gas reduction stations, propane-butane-air mixers, monitoring stations, and gas detection systems.
• Storage Tank Selection: Determination of the type and capacity of LPG storage tanks.
• Transport Infrastructure Development: Design of loading/unloading racks, vaporizers, gas reduction stations, propane-butane-air mixers, monitoring stations, and gas detection systems.
Environmental Assessment and Safety Measures:
• Environmental Impact Assessment: Evaluation of the project’s environmental footprint.
• Safety System Design: Incorporation of emergency equipment and control systems to mitigate leakage or explosion risks.
• Emergency Response Plan: Establishment of procedures for managing emergencies.
• Safety System Design: Incorporation of emergency equipment and control systems to mitigate leakage or explosion risks.
• Emergency Response Plan: Establishment of procedures for managing emergencies.
Construction and Installation:
• Technical Support and Supervision: Oversight of construction activities and compliance with design.
• Installation Schemes and Testing Procedures: Development of assembly diagrams, testing, and commissioning procedures.
• Installation Schemes and Testing Procedures: Development of assembly diagrams, testing, and commissioning procedures.